Product Manager
Skills & Expertise
- Preventive Maintenance
- Cost Estimation
- Electrical Installations
- Project Planning
- Site Analysis
- PLC Design
- Distributed Control System
- Safety Audits
- Electronic Circuit Analysis
- Electronic Circuit Design
- Electrical schematics
- Power Distribution
Experience
Jan. 2019 – Present
Production Manager, Green Water Planet Company
- Provided direct oversight to each of the major divisions within the Production environment, starting from the production of the Fibres, to membrane production packaging and delivery.
- Met prospective clients to quantify their needs on the wastewater needs, draw up the timeline, communicate to staff, and fulfill them on-time and on-budget.
- Evaluated competition regularly, revisited pricing strategy, and advised CEO if changes were needed.
- Participated actively in regular operations meetings with key staff and presented management reports to the CEO.
- Trained and appraised production workers on apparatus use, industry norms and practices, and factory operating policies.
May 2016 – Present
Electrical Supervisor, Arkan Banaye Pars Company
Oct. 2013 – Dec. 2014
- Managed and coordinated the tasks and responsibilities of employees and technicians.
- Estimated the human resources required for projects and provided time schedules.
- Investigated the adequacy of the information in the approved plans for electrical installations.
- Controlled the electrical installation components in terms of type, quality, manner of transportation, maintenance, their compliance with approved plans, technical specifications, and national standards of Iran.
- Provided cost estimation for electrical installations.
- Supervised and coordinated activities in designing programmable logic controllers (PLC) for homes that provided energy-efficient, secure, and cost-effective management of home systems, including heating and air conditioning, alarms, and access control.
- Controlled and supervised the execution status, location, and height of the installation components in all stages of the building construction.
dec. 2014 – Mar. 2016
Electrical Supervisor – Raah Kar Sazeh Ista Construction Co., Rasht – Guilan Province
- Coordinated the activities of execution sections with employers and engineers.
- Planned and scheduled the operations to shorten the period of the projects.
- Controlled the method of execution of the earthing system, wiring, and cabling.
- Controlled, installed, applied, and executed the elements of electrical installations, including lightings, switches, outlets, etc.
Education & Credentials
Jan. 2013 – Aug. 2015
Master of Science: Electrical Engineering-Power, Islamic Azad University – Lahijan Branch
Sep. 2006 – Sep.2010
Bachelor of Science: Electrical Engineering-Electronics, Islamic Azad University – Lahijan Branch
Certification
Apr. 2013
- Laptops, The Academic Center for Education, Culture, and Research (ACECR)
Jan. 2011
- Digital Circuit Analysis and Design, Technical & Vocational Training Organization
Dec. 2010
- Programmable Logic Controller Operation-Grade 2, Iran Technical & Vocational Training Organization
Publications
A. Haghighpour, N. Zandi, A. Mostaan and A. Baghramian, “A family of single-phase converters with a reduced number of components and leakage current elimination in photovoltaic systems,” 2016 7th Power Electronics and Drive Systems Technologies Conference (PEDSTC), Tehran, 2016, pp. 129-133.